Data Centers
Prevent Downtime. Reduce Energy. Optimize Cooling.
Built for Data Center Cooling
Keep the Servers Running. Keep the Cooling Flowing. Simulate pressure surges, pump trips, and valve failures before they threaten uptime.
Simultaneously solve flow and heat transfer across your entire cooling loop. Fathom predicts pressure drops and temperature profiles in one environment, so imbalances are caught in the model — not on the floor.
Simulate the moment a pump trips or a valve slams shut. Impulse captures the full transient response of your cooling network so you can specify surge protection, protect piping integrity, and guarantee uninterrupted uptime.
Automated Design Optimization- Define your targets for flow, pressure, and temperature — then let Goal Seek & Control automatically adjust pump speeds and valve positions to meet them. Eliminate trial-and-error and deliver balanced designs that hit performance and budget goals simultaneously.
Short transient tests miss the slow-building risks. Extended Time Simulation models how critical parameters evolve over hours or days, uncovering thermal stratification, system resonance, and creeping pressure issues before they become outages.
Compare multiple design configurations side-by-side with color-map overlays that surface flow imbalances, pressure deviations, and temperature hotspots at a glance. Faster decisions. Defensible designs. Audit-ready reports.
Bring Monte Carlo analysis to your projects. Evaluate cooling system failure cascades and associated thermal risks, cooling water demand variations with load, on-site renewable and battery storage sizing and overall ROI and financial risks.
Coupled hydraulics & heat-transfer modeling
Transient simulation
Multi-variable goal-seek & control
Extended-duration transient analysis
Scenario manager with gradient visualization
Compliance reporting
Results
Balanced airflow across 24 branches in a high-rise data center conversion.
Learn More
Imported and simulated 1,000+ piping elements to evaluate surge safety in an 11-story data center.
Learn More
Determined optimal pipe sizing for condenser water distribution on the 29th floor of a high-rise data center.
Learn More
Reduced pump count from 6 to 4, saving $200k per year in cooling water operations.
Learn More
Optimized chilled water pump operation to save $60k annually across campus.
Learn MoreFocused Expertise
- Hyperscale Cloud Data Centers
- Enterprise On-Premises Data Centers
- Commissioning & Retro-Commissioning Consultants
- Colocation & Edge Facilities
- A/E Design-Build Firms
Let's get to your great.
Contact UsRelated Resources
Explore More Resources
Industry Events We Attend
- Advancing Data Center Design & Engineering
- DCD Connect